Pour Strip Zero
Reinforced concrete slab on a commercial jobsite, the kind of structure the PS=Ø blog covers

The PS=Ø Blog

Plain-language articles from our engineers on pour strips, delay strips, closure pours, movement joints, and post-tensioned slabs, and how a mechanical rebar splice takes the leave-out off the critical path.

ICC Approved Mechanical Rebar Splice | ACI 318 Type 1 & Type 2 Compliant | 45+ Years of Engineering Expertise | Made in the USA
Written by the Engineers Who Remove the Leave-Out

Field-level writing on the detail we named ourselves after.

Every article here is written by the team whose entire product is engineered to take a pour strip off the drawings. Instead of neutral glossary entries, these pieces carry the point of view of engineers who have replaced the open leave-out on live commercial decks. Start with the definitions below, then call (800) 355-8414 to talk through your own structure.

Ready to Detail It Out?

Design the pour strip out of your next slab.

Tell us about your structure and our engineers will walk you through detailing and where PS=Ø can take a pour strip or delay strip off the critical path.