The PS=Ø Blog

Plain-language articles from our engineers on pour strips, delay strips, closure pours, movement joints, and post-tensioned slabs, and how a mechanical rebar splice takes the leave-out off the critical path.

ICC Approved Mechanical Rebar Splice | ACI 318 Type 1 & Type 2 Compliant | 45+ Years of Engineering Expertise | Made in the USA
Written by the Engineers Who Remove the Leave-Out

Field-level writing on the detail we named ourselves after.

Every article here is written by the team whose entire product is engineered to take a pour strip off the drawings. Instead of neutral glossary entries, these pieces carry the point of view of engineers who have replaced the open leave-out on live commercial decks. Start with the definitions below, then call (800) 355-8414 to talk through your own structure.

All Articles

Latest from the PS=Ø engineers

Delay Strips vs Shrinkage Strips

Delay strip, shrinkage strip, pour strip, pour-back strip, and closure strip are five names for one leave-out at a construction joint. What each term means, where each shows up on drawings, and how a mechanical rebar splice eliminates the detail no matter what it is called.

Read the article

Post-Tensioned Concrete Explained

How post-tensioned concrete works, step by step, and why a PT slab shortens through elastic shortening and creep at stressing, not only drying shrinkage. That mechanism is why post-tensioned slabs need a pour strip, and how a mechanical rebar splice removes the open leave-out.

Read the article

Post-Tensioned vs Reinforced Concrete

How post-tensioned and conventionally reinforced concrete slabs differ, where each is used, and how each handles the movement joints and pour strips that PS=Ø eliminates.

Read the article

Rebar Mechanical Coupler That Eliminates the Pour Strip

A rebar mechanical coupler joins two bars end to end so steel is continuous across the joint. See the ACI 318 Type 1 vs Type 2 distinction, how a mechanical splice beats a lap splice, and why the right coupler removes the pour strip entirely.

Read the article

What Is a Pour Strip in Concrete?

A pour strip is the leave-out at a construction joint left open so slabs can shrink, then cast later. See how a pour strip differs from a pour stop, delay strip, and closure pour, why it sits open for weeks, and how a mechanical rebar splice eliminates it.

Read the article