Cart Total Items (0)

Cart

From the field

PS=Ø delivers real results – cutting costs, accelerating schedule, and improving safety—but what truly sets PS=Ø apart is their team: bold innovators and relentless partners who support your project from start to finish.

Nick Muntean, Hensel Phelps - Superintendent

I was extremely impressed with how easy it was to install and incorporate. The PS=Ø team knew exactly what they needed from the engineers, asked for it clearly, and then took over by providing shop drawings we could implement immediately. It was simple—especially considering how stringent our structural engineering team was on this project.

Javier Landeros, Willow Bridge PC - Assistant Project Manager

On a tight site like Encore Lot 12, PS=Ø helped us clear space fast. PS=Ø gives you a cleaner connection, less cracking risk, and a better finish — all while letting the concrete go through more natural volume change without schedule risk. It’s a smart system that makes things faster, safer, and just easier overall.

Blake Dorr, PCL - Project Engineer

MMJV also utilized a mechanical reinforced splice system called PS=Ø that eliminated pour strips on hotel Floors 2-7... After a shrinkage period of 17 weeks for these six floors, crews grouted the couplers. By eliminating the pour strip, trades could easily traverse each of these floors and perform overhead work without waiting for delay strip placement. The system provided schedule savings with minimal upfront costs.

L.L. Poirier, ENR West - Digging Deeper