Project Information
GE Johnson
Healthcare
4 Months
$2 Million Dollars
Accelerating Schedules. Eliminating Backshoring. Delivering Certainty.
The AdventHealth Lenexa campus is one of two AdventHealth hospital projects to implement the PS=Ø system—and the results speak for themselves. In partnership with GE Johnson, PS=Ø helped accelerate the overall schedule by more than 4 months, allowing crews to begin and complete their work significantly faster than traditional methods would have allowed.
By eliminating the need for pour strips, PS=Ø removed the structural delays and coordination issues that typically slow down project timelines. Our system also removed the need for backshoring entirely—unlocking massive efficiencies for both the general contractor and subcontractors, and driving substantial cost savings across the board.
At its core, this project exemplifies how PS=Ø is redefining what’s possible in concrete construction. Faster. Safer. More efficient. No compromise.
Benefits Delivered:
- Eliminated Traditional Pour Strips
- 4+ Months of Acceleration
- Increased Jobsite Efficiency
- Eliminated Backshoring
- $2+ Million in Cost Savings
- Improved Jobsite Safety