Project Information
Red Hawk Casino Hotel
Hospitality
3 Months
$1.5 Million Dollars
Faster, Safer, and Seismic Rated.
At the Red Hawk Casino Hotel, PS=Ø helped the project team eliminate pour strips, accelerate the schedule by 3 months, and significantly improve jobsite safety—all while meeting the demanding requirements of a high seismic zone.
By removing the need for backshoring and traditional pour strips, PS=Ø allowed trades to access floors sooner and work more efficiently—reducing congestion and eliminating the hazards of large trenches and exposed rebar.
Importantly, this project demonstrates how PS=Ø performs in even the most complex structural environments. Fully approved for seismic use, our system delivered both code compliance and real-world results—with Zero Compromise.
The Red Hawk Casino Hotel is a clear example of how PS=Ø brings speed, safety, and confidence to modern construction.
Benefits Delivered:
- Eliminated Traditional Pour Strips
- Accelerated Trades and Schedule
- High Seismic Rated and Approved
- Eliminated Backshoring
- $2M in Cost Savings
- Improved Jobsite Safety