Project Information
Partner:
Red Hawk Casino Hotel
Project Type:
Hospitality
Schedule Acceleration:
3 Months
Cost Savings:
$1.5 Million Dollars
Project Summary

Faster, Safer, and Seismic Rated.

At the Red Hawk Casino Hotel, PS=Ø helped the project team eliminate pour strips, accelerate the schedule by 3 months, and significantly improve jobsite safety—all while meeting the demanding requirements of a high seismic zone.

By removing the need for backshoring and traditional pour strips, PS=Ø allowed trades to access floors sooner and work more efficiently—reducing congestion and eliminating the hazards of large trenches and exposed rebar.

Importantly, this project demonstrates how PS=Ø performs in even the most complex structural environments. Fully approved for seismic use, our system delivered both code compliance and real-world results—with Zero Compromise.

The Red Hawk Casino Hotel is a clear example of how PS=Ø brings speed, safety, and confidence to modern construction.