Project Highlights

  • Eliminated pour strips
  • Reduced cost
  • Accelerated construction
  • Improved safety
  • Allowed for volume change
  • Maintained structural integrity
  • Coupled beam and slab rebar

 

Our PS=Ø® system was used on the Okana Hotel in Oklahoma City. We worked with Manhattan Construction and Cantera Concrete. Justin Smith, the PM on the project estimated is saved them at least 6 weeks of schedule by eliminating the delay strips that were designed in. By using the PS=Ø® system in lieu of traditional pour strips, they were able to accelerate all the other trades and cycle forms up the 10 stories of elevated PT decks without having to wait to pour.