PS=Ø® is a proven technology designed to eliminate delay Strips in elevated concrete construction, thereby accelerating construction schedules significantly

Select Your Role To Learn More

Owner

General Contractor

Concrete Contractor

Engineer

General

Closing pour strips is the most expensive concrete pour on a job. Formwork, shoring, and backshoring must stay in place for weeks, and crews must reassemble for small pours. The PS=Ø® system eliminates this costly and time-consuming step.

Pour strips are a drag on any construction schedule. They not only require re-pouring the leave-out, but also restrict worker access. By eliminating pour strips, the PS=Ø® system can cut weeks or even months from construction schedules.

The PS=Ø® innovative rebar coupler reduces the amount of concrete cracking which achieves a high level of concrete finish.

An open leave-out in a floor is a major safety hazard. Pour strips are particularly hazardous because they run the entire width of the slab and are impossible to avoid. The PS=Ø® system replaces dangerous leave-outs with a narrow, grouted joint.

Pour Process

Accelerate Other Trades
Completed Pour at Stressing Strip
Completed Pours at Wall