Skip to content
  • Home
  • About us
    • Our Story
    • Who We Are
    • Affiliation
  • Product
    • PS= Ø® Coupler
    • PS= Ø Information Sheet
    • PS= Ø Technical Specification
    • PS=0 Installation Manual
    • Applications / Downloads
    • Pour Strip in P/T
    • Pour Strip in Reinforced Concrete
    • faq
  • Media
    • Articles
    • Videos
    • Installation Video
  • Testimonials
  • Blog
  • Contact Us
  • Home
  • About us
    • Our Story
    • Who We Are
    • Affiliation
  • Product
    • PS= Ø® Coupler
    • PS= Ø Information Sheet
    • PS= Ø Technical Specification
    • PS=0 Installation Manual
    • Applications / Downloads
    • Pour Strip in P/T
    • Pour Strip in Reinforced Concrete
    • faq
  • Media
    • Articles
    • Videos
    • Installation Video
  • Testimonials
  • Blog
  • Contact Us

Testimonials

I was the structural superintendent for the AdventHealth Hospital project in Overland Park, Kansas. The AdventHealth project is a new 190,000 square-foot hospital located in Overland Park, Kansas that was completed in 2021. We selected the PS=Ø® Mechanical Reinforcement Splice System after installation of backshoring and unforeseen circumstances impacted the original project schedule. We were able to pick up flow on construction the schedule and get the building enclosed, saving time and money for the project.saving time and money for the project. I would recommend this system for anyone who would like to reduce the amount of time spent waiting to place delay strips and complete enclosure, while increasing safety by not having a leave-out in the slab.
Patrick Houlehan Project Superintendent
I am a Senior Project Superintendent for Weis Builders, Inc. Our concrete subcontractor, Gresser Companies proposed using PS=Ø couplers on the Eleven 02 Hotel project in Rochester, MN in order to reduce the size of the pour stirps and the amount of formwork and shoring. By using PS=Ø couplers on our project we were able to save time by starting our wood framing 45 days earlier over the pour stirp. Safety was another benefit because we only had a small joint with less formwork and reshoring compared to a 4-foot wide strip. I would recommend this system for anyone who would like to reduce the amount of time spent waiting to begin wood framing on the podium level and increase safety by not having a leave-out in the slab.
Anthony Rand Senior Project Superintendent
We were very pleased with our experience using PS=0. We will be recommending future projects use their system whenever a pour strip is in the plans.
Danny Pitts

Address

  • 192 West 9th Street St. Paul, MN. 55102

Contact Us

  • 800-355-8414
  • sales@pourstrip0.com

Social Links

Linkedin Youtube